Completed PPI Projects
BackConcrete Walkways, Partial - 2024
Archival date: Jan-2025Park Place BOD will continue to identify trip hazards and/or sidewalk separation as phase two and review areas that need correcting. This may be a combination of replacement or mud jacking.
National Softwash - Completed
Archival date: Jan-2025Park Place BOD has finished the second and final phase with National Soft Wash this year. In 2023 50% of the buildings and patios were washed and this year (2024) the remaining 50% were completed. The BOD has no plan to continue this service on an annual basis and we ask every homeowner to help maintain the cleanliness of their homes and patios.
Park Place Itasca Website
Park Place BOD has renewed a contract with Bluehost design services to maintain the Park Place of Itasca website as needed by the Park Place Board of Directors.
Ponds, Control Structures, Inspections and Capital Repairs - 2024
Park Place BOD will look into repairs or maintenance on general pond structures (inlets). We will discuss with contractors next steps.
Ponds, Erosion Control, Rip Rap Replenishment - 2024
The rip rap replenishment project around the ponds is slated for more rock this year. As we look into the erosion control project we are also looking into augmenting stone rip rap over the existing stone perimeter.
Walls, Trim , and Paint Finishes
Approximately every six years we HOA will paint the exterior wood trim on our units. We have obtained our quotes and plan to proceed with Inside Out Construction (IOC). As we looked at painting the exterior trim, it became evident that much of the wood trim has rotted and can’t be painted. With these findings we performed a study of all the homes and where repairs are required with a plan to have the wood replaced prior to commencement of the painting. Starting next Spring 2025, we intend to have IOC perform needed wood trim repairs (billed back to homeowners) and then commence with painting as an HOA Capital Expense. More details to come.
Window Replacement Project (2023 - 2028)
Park Place BOD will continue to work on window replacement project. Each home will be evaluated and older windows will be replaced. Due to budgetary reasons this project will span five years from older homes to the newer homes based on when they were built within the community.